LONG LEAD 300 CM WITH BRASS SNAP HOOK BLACK
Product Code: 09SA42508<>NERO
€ 18.40
€ 20.00
- 8%
Quantity:
Hai bisogno di aiuto per l' acquisto di questo prodotto?
Product available
Shipped in 4 days
Details
SARTORE – EXTRA LONG LEAD ROPE 300 CM WITH BRASS SNAP HOOK
MORE CONTROL AND FLEXIBILITY DURING HANDLING
The Sartore extra-long lead rope is perfect for those who need greater range of motion when leading or managing the horse. With a total length of 300 cm, it offers more flexibility than standard models. It features a brass snap hook, durable and rust-resistant, ensuring secure attachment and long-term reliability. Ideal for stable work, transport, or waiting in the warm-up ring.
-
Strong braided nylon
-
Rustproof brass snap hook
-
Length: 300 cm
-
Great for leading, grooming or groundwork
-
Comfortable and easy to handle
Color: BLACK
Size: One size – 300 cm
other items SARTORE
Similar items