- 8%

LONG LEAD 300 CM WITH BRASS SNAP HOOK BLACK

Product Code: 09SA42508<>NERO
€ 18.40 € 20.00 - 8%
colore desc: NERO
Size:

UNICA

Quantity:
Hai bisogno di aiuto per l' acquisto di questo prodotto?
Product available
Shipped in 4 days
Details

SARTORE – EXTRA LONG LEAD ROPE 300 CM WITH BRASS SNAP HOOK
MORE CONTROL AND FLEXIBILITY DURING HANDLING

The Sartore extra-long lead rope is perfect for those who need greater range of motion when leading or managing the horse. With a total length of 300 cm, it offers more flexibility than standard models. It features a brass snap hook, durable and rust-resistant, ensuring secure attachment and long-term reliability. Ideal for stable work, transport, or waiting in the warm-up ring.

  • Strong braided nylon

  • Rustproof brass snap hook

  • Length: 300 cm

  • Great for leading, grooming or groundwork

  • Comfortable and easy to handle

Color: BLACK
Size: One size – 300 cm

other items SARTORE
Similar items